On-chain CIP-179 survey.
A test survey on preprod, linked from an information action, to exercise the CIP-179 survey link end to end. The question itself is real: drep_activity currently expires a DRep after 20 epochs without activity, and there is no settled view on whether that window is the right one.
- Eligible to respond: DReps, SPOs, stakeholders
- Responses accepted through epoch 318 (inclusive)